Qvp VAK-MATIC: VM10FS Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Équipement Qvp VAK-MATIC: VM10FS. Q.V.P. VAK-MATIC: VM10FS User Manual [en] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 1
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Quality VAKuum Products, Inc.
Or visit our site at www.qualityvak.com
74 Apsley St. - Hudson, MA 01749
Tel: 978-562-4680 - Fax: 978-562-4681
CALL 1-800-547-5484 TODAY!
INSTRUCTIONS FOR THE VM10FS & VM15FS
ALL-IN-ONE VAK-MATIC CONTROLLER
11/20/2006 - VM10FS Instructions.cdr
VAKuum Bag
or
Frame Press
Place your two VCA6 connectors under the
bag wherever it is most convenient for you.
Congratulations, you have just purchased the finest system ever made for VAKuum Bag Veneering & VAKuum
Klamping. This system combines the best features of both applications into one complete system.
Valve in rear of box.
The hand valve in the rear is to be closed when doing veneering. When working with vacuum jigs and fixtures,
turn the valve on (points to left) and turn the red rocker switch to VAK BAG, then step on the TOP of the foot
pedal. This will give vacuum to the jig, to release the part from the jig, step on the BOTTOM of the foot pedal.
Use the Y hose to connect the two vacuum barbs into one line for vacuum clamping.
ON/OFF SWITCH
Make sure that when you are clamping you have the red ON/OFF switch on “VAK-KLAMP.” Never have the
switch on “VAK-BAG” when you are clamping. Only use “VAK-BAG” when you are veneering.
TOGGLE SWITCH
When you are veneering, put the toggle switch to the ON position. This will make both pumps in the system
work together to evacuate the bag faster.
There are two venturi pumps inside your “VAK-MATIC” controller. When Klamping, you normally will need just
one venturi pump working. Therefore, you can put the toggle switch to the OFF position when you are
Klamping. This will reduce your compressed air usage, and make your system work more efficiently. When you
turn the toggle switch to OFF, you must use the tee and short hose set up to combine the two vacuum lines
intro one.
KEEP THE AIR PRESSURE BELOW 100PSI OR YOU WILL DAMAGE THE SOLENOID.
Vacuum Lines
Set up For
Veneering
Set up For
Klamping
Compressed Air
Line
G
Vue de la page 0
1

Résumé du contenu

Page 1 - Quality VAKuum Products, Inc

Quality VAKuum Products, Inc.Or visit our site at www.qualityvak.com74 Apsley St. - Hudson, MA 01749Tel: 978-562-4680 - Fax: 978-562-4681CALL 1-800-54

Modèles reliés VAK-MATIC: VM15FS

Commentaires sur ces manuels

Pas de commentaire